Span smart panel installation in Santa Cruz County

Circuit-level monitoring and control — smart panels installed and configured on your existing service.

4.9 stars, 161 reviews on Google — See the reviews behind this rating (opens in a new tab)BBB Accredited · A+ (opens in a new tab)CSLB #C10-109723720-year workmanship guaranteePermit + inspection handledLicensed C-10 (Electrical)

What this is

A Span panel is a load center whose breakers can be switched and prioritized from an app, and that matters most at one particular moment: when the grid is down and a battery is carrying the house. Instead of a fixed critical-loads subpanel wired the day the solar went in, the list of what stays on becomes a setting you can change — refrigeration and lights now, the dryer and the EV charger later. What a particular panel will actually do during an outage, and how it decides, is the manufacturer's specification rather than ours; read it and get it in writing before you settle on a model. Our half is ordinary load-center work done carefully: feeders, grounding and bonding, circuit transfers, permit, inspection — and then a commissioning step where the panel comes online, every circuit is named against what it truly feeds, and the outage priorities get set with you rather than left at defaults.

We install these and we are glad to. What we will not do is tell you that you need one. A smart panel costs meaningfully more than a conventional load center, and it adds a software dependency to a piece of equipment that otherwise has none. The feature that earns the difference is load management during an outage, and that only matters if you have a battery or are planning one. Without a battery, what you are buying is circuit-level visibility and remote switching — genuinely useful, and a matter of taste rather than necessity. Siemens is what we install by default on conventional panel work, and for most homes it is still the right answer. When a Span is what you want, we install it properly, configure it, and hand it over labeled.

Outage planning is a conversation about tiers, and it is worth having before the equipment is ordered rather than during the first shutoff. A battery holds a finite amount of energy and can deliver only so much at once, so the useful question is not what you would like to keep on — it is what you want still running at hour twelve. That list is usually short: refrigeration, a few lights, the well pump if you are on one, medical equipment, the internet. Below it sit the loads you would take back when the sun is out and the battery is recharging: the heat pump, the range, the EV charger. Which of your circuits can sit in which tier depends on where the panel lands in your service, because a panel can only manage the circuits that pass through it. We settle that before we order, and we design it alongside the battery instead of bolting it on afterwards.

One question worth asking before you buy. Some homeowners look at a smart panel as a way to add an EV charger, a heat pump, and induction without upsizing the service — letting the panel shed loads instead of buying more capacity. That can be a legitimate design and it can also be wishful, and which one depends on the load calculation for your specific house and on whether your building department will accept a managed-load approach. For most addresses in this area that department is the County; only Santa Cruz, Capitola, Scotts Valley, and Watsonville run their own. Run the Panel Load Calculator to see where you actually stand, and expect us to confirm the approach with the jurisdiction before we design around it rather than after.

When you need this

  • You have a home battery, or one is on the plan, and you want to choose what it carries during an outage instead of finding out during a public-safety power shutoff
  • An earlier solar or battery install left you with a critical-loads subpanel you never liked, and you want what is backed up to be a setting rather than a rewire
  • You are sequencing an EV charger, a heat pump, and an induction range and want a serious look at managed loads before committing to a service upgrade
  • You are on a well, and losing water partway through a multi-day outage is the thing you actually care about
  • Your outage plan is currently to unplug things quickly, and you would rather it were decided in advance and applied without anybody standing at the panel
  • A battery or a generator is being scoped now, and you want the backed-up circuit list decided deliberately rather than fixed by whatever subpanel gets wired that day
04What's included

Exactly what we handle — and the two things you handle.

Sunrise provides

  • A load calculation and a proper look at your existing service before any equipment is ordered, so what gets specified actually fits the house
  • A written outage list agreed with you first — what has to stay on, what sheds, and in what order — since that decides where the panel has to sit
  • The Span panel installed to the manufacturer's instructions — feeders, breakers, terminations, and mounting
  • New grounding and bonding to current code, with every existing branch circuit transferred and re-landed
  • Coordination with the battery, inverter, or generator side of the project, so the backed-up boundary and the panel configuration are designed as one thing rather than in sequence
  • Commissioning: the panel brought online, every circuit named to match what it truly feeds, and the outage priorities set with you standing at the panel
  • Building permit pulled and inspection coordinated, plus PG&E shutdown coordination where the job touches the service
Warranty: 20-year workmanship warranty on our installation, transferable — see warranty terms. The panel, its breakers, its firmware, the app, and what the panel does when the grid drops all belong to the manufacturer's warranty rather than ours. · Permits: pulled + inspection coordinated by us, built into the quote · Cleanup: Drop cloths down, old panel and packaging hauled away, the space left clean, and the directory filled in before we go. Drywall repair where an old panel sat is out of scope — we will recommend someone.

You provide

  • A decision on the panel — a Span, the other smart panel we install, or a conventional Siemens load center — or a conversation about the trade-offs before you commit
  • A list of what genuinely matters to you during an outage, or a walk through it with us before we commission
  • Access to the panel area on the work day, and a plan for the no-power window if the job touches the main service
05How it works

Start to finish, with real times.

1Scheduled with you

Free home electrical inspection

A tech looks at your existing panel and service, runs the load numbers, and asks the question the rest of the job hangs on: what do you want running when the power is out. You get a written report and a real quote either way, including what the conventional route would look like.

2Lead time set by equipment and the building department

Backup design and specification

We settle what the panel has to be able to manage, and therefore where it sits in your service, then coordinate with the battery or generator side of the project, order the equipment, pull the permit, and line up PG&E if the job touches the service.

3You will know the no-power window before the day

Install day

Power off, panel in, circuits transferred and re-landed, grounding and bonding brought to current code, and the building-department inspection coordinated. Where the job touches the main service there is a no-power window, and you will know its length before the day rather than on it.

4Before we leave the site

Commissioning and the outage walkthrough

The panel comes online, every circuit gets named against what it feeds, and we set the outage priorities with you standing there — what the battery carries first, what sheds, and what you would rather it never tried to run at all. Then the app walkthrough, and the workmanship warranty registered.

06Pricing transparency

Every quote is free. The range depends too much on your home to fake it.

Two things move a Span quote, and they move it by very different amounts. The first is the equipment: a smart panel costs a good deal more than a conventional load center, that difference is set by the manufacturer, and shopping around does not change it much. The second is how much of your service the panel has to be able to manage. A panel that only needs to carry a short backed-up list can sit downstream of what you already have, and the job stays contained. A panel that has to be able to shed the dryer, the range, and the EV charger has to be in the path of those circuits, which usually means it takes the place of the load center — and in this county that carries the full service rebuild, a PG&E shutdown, and the permit that comes with any main panel job. It also depends on whether the house already has a subpanel: swapping that subpanel for a Span, instead of the main, keeps the main service out of the job, though the Span then manages only the circuits that subpanel feeds. We tell you which one your house is before we quote, and we will say plainly when a conventional Siemens panel would do the same electrical work for less.

What it costs

Quotes are free. The variance on this work is too wide for an honest range — book a free inspection and we’ll give you a real number for your specific home, in writing.

What moves the number

The equipment itself — the smart panel is the largest single line on the quote, and the manufacturer sets it · How many circuits have to be inside the panel for the outage plan to work, which decides whether it sits downstream or takes the place of the load center · Whether a battery, generator, or solar is in scope, since the interconnection and the backed-up boundary are part of the same design · Whether an existing critical-loads subpanel from an earlier solar or battery job has to be unwound and its circuits brought back · PG&E shutdown coordination and the full service rebuild wherever the work reaches the main service — the standard shape of a main panel job here, not an add-on · Rural well and septic loads on mountain properties like Bonny Doon, Boulder Creek, and Corralitos, where a multi-day shutoff means water and the backed-up list gets longer · Building department permit fees by jurisdiction: the County for unincorporated addresses, the city in Santa Cruz, Capitola, Scotts Valley, and Watsonville
No hidden fees. Every quote is free and detailed.

What customers say

4.9 on Google
161 reviews on Google
Read all reviews

Carrie

via Google
“Thank you to the Sunrise Electrical Contracting team for updating the new main electrical system on my mom's home after the storm damaged the power lines and home equipment this winter… They replaced Main Service Upgrade Overhead, and added a Sub-Panel Install/Replacement Outdoors… the team of Branden, Jimmy, Ian, and Tylor worked long hours during the storm for a few days to get us up and running again before the next storm arrived.”
Carrie
Storm-damage main service upgrade

Roya P.

via Google
“Sunrise Electrical rewired our house, replacing the old knob-and-tube wiring with seamless, safe, and up-to-code wiring at a very reasonable price. They were incredibly efficient, worked cleanly, and addressed all our questions and concerns with care. We can't recommend them highly enough!”
Roya P.
Knob-and-tube rewire, whole house

Linda W.

via Google
“Branden & his experienced crew installed a Level 2 electric charger together with an extra 240v outlet in our Live Oak garage. They were informed, congenial, & professional and their work was timely and permitted as required by the County. (The cost of the County permit was 53% of the entire project cost — no 5 stars for the County.) I highly recommend Sunrise Electrical!”
Linda W.
Level 2 EV charger + 240V outlet
09Frequently asked questions

7 questions. Real answers.

Pulled from what we actually hear on quotes and on-site. If yours isn't here, ask us — we'll answer in plain English.

Is a Span worth it if I do not have a battery?
Honestly, usually not, and we would rather say that here than at the quote. Without a battery you get circuit-level visibility and remote switching. Those are real, and some people love them. What you do not get is the feature that justifies the price difference, which is choosing what a battery carries when the grid is down. If a battery is on your plan — even a year or two out — the calculation changes and a Span is worth a serious look.
What actually happens during an outage?
The specifics belong to the manufacturer and to your battery, and you should have them in writing before you buy: what the panel does when the grid drops, what it does as the battery gets low, and what it does with no internet. Our part is the part that is genuinely ours — making sure the circuits you care about are inside the panel, that the interconnection is right, and that the priorities are set with you rather than left at defaults. A panel can only manage the circuits that pass through it, which is why the outage list has to be decided before the job is scoped rather than after.
How do you decide what gets backed up?
Sitting at the panel with you, in tiers. What has to stay on at hour twelve is a short list: refrigeration, a few lights, the well pump if you are on one, medical equipment, the internet. Below that sit the loads you would take back once the sun is out and the battery is recharging. Where the battery's own equipment already assumes a particular arrangement, that comes first and we design around it. What we will not do is set it at defaults and drive away.
Can a smart panel let me skip a service upgrade?
Sometimes, and it turns on two things that are nobody's opinion: the load calculation for your house, and whether your building department will accept a managed-load design. The Panel Load Calculator answers the first. We confirm the second with the jurisdiction — the County for most addresses in the area, the city in Santa Cruz, Capitola, Scotts Valley, and Watsonville — before designing around it. If the answer comes back no, a conventional 200-amp upgrade is the straightforward path.
We already have a critical-loads subpanel from an earlier solar job. Does this help?
Often, and it is one of the better reasons to do this. A critical-loads subpanel fixes the backed-up list at whatever was wired the day it went in, and changing your mind later means an electrician and a rewire. Moving that decision into the panel makes it a setting instead. Whether your existing arrangement unwinds cleanly depends on how it was built, which is a walkthrough question rather than something a page can answer.
Do you install Span?
Yes. Span is one of two smart panels we install, and choosing between them is a real decision rather than a formality. What we are not is a dealer or a certified installer for the brand — we hold a CSLB C-10 electrical license and we install the equipment you have chosen. Siemens is still what we put in on conventional panel work, and for a home without a battery it is usually the better value. The rest of what we do on this side of the house is on the smart home page.
Is the permit included, and how long is the power off?
Yes, the permit is pulled and the inspection coordinated as part of the project, with the cost built into your quote rather than added later. The no-power window depends on the configuration: a panel fed from your existing service is a shorter interruption, while taking the place of the main panel means a PG&E shutdown and the same kind of window as any main panel job. You will know the length before the day.
10Even if Sunrise isn't the answer

Here’s the honest path — wherever it leads.

We'd rather you get the right outcome than the Sunrise outcome. Some of this points away from us on purpose.

Outside Santa Cruz County?

Look for a CSLB-licensed C-10 contractor near you and verify at cslb.ca.gov. Ask how they would decide your backed-up circuit list, and ask the manufacturer what the panel does when the grid drops and the battery runs low. Both answers matter more than the brochure does.

Browse our field guides

Would a conventional panel do?

For most homes without a battery, it would, and it costs less. Our 200-amp page covers what a main panel job actually includes in this county — the full service rebuild, the permit, and the PG&E coordination.

See the 200A panel upgrade

Not sure yet?

A free inspection gets you the load numbers and an honest read on whether outage load management earns its cost in your house. You keep the written report either way, and there is no obligation to schedule anything.

Schedule a free inspection
12Service areas

We do this work everywhere in Santa Cruz County.

From Davenport to Pajaro Dunes, San Lorenzo Valley to Pleasure Point. Same crew, same warranty, same pricing.

13One more thing

Want an honest read on what a battery would carry?

Free inspection, the load numbers, and a written quote — including what the conventional panel would look like instead.