Panel Load Calculator

Work out the calculated load on your panel the way an electrician does — the standard method, CEC Article 220, Part III.

Skip to the result

The home

The code counts at least two small-appliance circuits and one laundry circuit whether or not they are there.

Appliances
Heating and cooling

Heating and cooling are compared and only the larger one is carried.

EV charging

EV charging is added at full value, outside the demand factors, at the greater of 7,200 VA or the charger nameplate.

Your service
Calculated load
82.98A

41% of a 200 A service

Fits

The working

  • General lighting and receptacles, after demand factors5,415 VA
  • Appliances fastened in place1,500 VA
  • Dryer5,000 VA
  • Range8,000 VA
  • Total19,915 VA

At 240 volts: 82.98 A

What's in this number

This runs the standard method from CEC Article 220, Part III — the same calculation that goes on a permit. General lighting and receptacles are taken at 3 VA per square foot, plus the small-appliance and laundry circuits the code counts whether or not they are there, then the demand table applies: the first 3,000 VA at 100% and the remainder at 35%. Four or more fastened appliances are taken at 75%. Heating and cooling are compared and only the larger is carried. EV charging is added at full value outside the demand factors, at the greater of 7,200 VA or the charger nameplate. The largest motor gets 25% added back. The result is divided by 240 volts to give amps.

What's next?

Sunrise Electrical Contracting holds California CSLB licence #C10-1097237 (C-10, Electrical).

This is a planning number, not a substitute for a licensed electrician confirming the panel, the service and the utility feed in person.