ADU electrical setup in Santa Cruz County

Subpanel or separate service for your ADU, with PG&E metering and building-department permitting coordinated.

CSLB #C10-109723720-year workmanship guaranteePermit + inspection handledPG&E coordination included
02What this is

An ADU gets power one of two ways: a subpanel fed from the main house service, or its own PG&E-metered service. Which one applies to your project is settled by two things — how much capacity your existing service actually has once both dwellings are counted, and what the building department will approve. It is not purely a preference, and it is worth settling on paper before the drawings are final.

The subpanel path is the simpler one when the existing service has the headroom. A feeder runs from the main service to the ADU, sized from a load calculation that covers the main dwelling and the ADU together. For a detached unit that feeder is normally trenched underground; for an attached ADU or a JADU inside the existing footprint it is a much shorter run. The ADU gets its own subpanel, its own branch circuits, and — where it is a separate structure — its own grounding electrode system and a disconnecting means at the building. One meter means one PG&E bill, which matters if you are planning to rent the unit and want the tenant billed separately.

The separate-service path means a second full electrical service: its own meter, its own PG&E account, its own service point. That brings a PG&E service application, a service-point determination made by the utility rather than by you, new service equipment, and usually trenching or a new drop. It is a bigger scope than a subpanel and it costs more. It is the right answer when the existing service genuinely cannot carry both dwellings and upgrading it is not the better use of the money, or when separate billing is a requirement rather than a nice-to-have.

Permitting goes to one of five places, and it depends on the address rather than the neighbourhood name. Santa Cruz, Capitola, Scotts Valley, and Watsonville run their own building departments. Everywhere else in the county — Aptos, Soquel, Live Oak, Pleasure Point, Felton, Bonny Doon, Boulder Creek, Corralitos, Davenport and the rest — is unincorporated County. We pull the electrical permit either way, and on most ADU projects our scope coordinates into the building permit your general contractor holds. On scope: Sunrise holds a CSLB C-10 (Electrical) licence, #C10-1097237, and owns the electrical work. If the ADU has a heat pump, we run the circuit and the disconnect while your HVAC contractor sets the equipment — that is C-20 work. Older county homes were not wired with a second dwelling in mind, and that awkward existing-conditions work is what we are built for.

04What's included

Exactly what we handle — and the two things you handle.

Sunrise provides

  • Whole-property load calculation covering the main dwelling and the ADU together, using the NEC 220.82 Optional Method
  • Siemens subpanel sized to the ADU's calculated load, with breakers matched to the panel brand for the listing (Square D or Eaton on request)
  • Feeder from the main service to the ADU — conduit, conductors, and trenching where the unit is detached
  • Grounding electrode system and a disconnecting means at the ADU where it is a separate structure
  • ADU branch circuits, devices, and required protection, terminated, tested, and labeled
  • Building permit pulled with the city or County building department, and inspection coordinated — built into the quote
  • PG&E coordination, including the service application where the ADU is getting its own meter
Warranty: 20-year workmanship warranty, transferable to the next owner — see warranty terms · Permits: pulled + inspection coordinated by us, built into the quote · Cleanup: Drop cloths inside, trench backfilled and compacted, spoil and offcuts hauled out. We put the ground back level along our route. Finish grading, sod, planting, and hardscape repair over the trench are a separate trade — we call that out at quote rather than leaving you to find it afterward.

You provide

  • The ADU plan set, so the circuit layout and the load calculation match what is actually being built
  • The appliance list — heat pump, water heater, range, EV charger — before we size the feeder, because adding it later means resizing
  • Site access along the feeder route, and a trench path clear of anything you would rather we did not dig through
05How it works

Start to finish, with real times.

1Scheduled with you

Free on-site inspection

A tech walks the main service, the ADU site, and the likely feeder route, then runs the load calculation on your real numbers and sends a written report and a quote. If the honest answer is that the main service has to be upgraded before the ADU can be fed, you hear that at this stage rather than mid-build.

2Lead time set by the building department — we give you the date as soon as we have it

Pick the path and pull the permit

We settle subpanel versus separate service with you, size the feeder, and submit the electrical scope to the city or County building department. Where the ADU is getting its own meter, this is also when the PG&E service application goes in.

3Scheduled with you once the feeder route is settled, and stated in your written scope

Install

Feeder trenched and run, subpanel or new service equipment set, ADU branch circuits pulled and terminated, grounding and bonding completed. On a separate service, PG&E's connection is scheduled against our inspection sign-off rather than the other way round.

4Before we leave, once the inspector has signed off

Inspection and walkthrough

Building-department inspection, then we walk you and your builder through the panel, label every breaker, register the 20-year warranty, and hand over the permit number and the signed-off inspection record.

06Pricing transparency

Every quote is free. The range depends too much on your home to fake it.

Two things move an ADU electrical quote more than anything else: which path you are on, and how far the ADU sits from the existing service. A subpanel on an attached unit a few steps from the main panel and a separately metered service on a detached unit at the back of a hillside lot are not the same job, and a single mid-range number would mislead you in both directions. The variable worth resolving earliest is capacity. Run the Panel Load Calculator for a first read, or have a tech verify it in person — because if the existing service cannot carry both dwellings, a 200A service upgrade becomes part of the project, and that belongs in the budget from the start rather than arriving as a surprise partway through the build.

What it costs
Quotes are free. The variance on this work is too wide for an honest range — book a free inspection and we’ll give you a real number for your specific home, in writing.
What moves the number
Subpanel off the existing service versus a second PG&E-metered service — different scope, different permitting, different timeline · Whether the main service has the capacity, or whether a service upgrade has to happen first · Distance from the main panel to the ADU, which sets feeder length and conductor size · Trench length and what sits on top of it — lawn, mature roots, a concrete driveway, or hillside rock · Attached ADU or JADU versus a detached unit, which needs its own grounding electrode system and a disconnect at the building · The ADU appliance package — heat pump, heat pump water heater, induction range, and EV charger all land in the same load calculation · Permit fees, which differ between the County and the four incorporated cities · Coastal corrosion-zone hardware where the ADU sits close to the water
No hidden fees. Every quote is free and detailed.
08What customers say · panels
4.9 on Google
158 reviews on Google
Read all reviews
via Google
“Thank you to the Sunrise Electrical Contracting team for updating the new main electrical system on my mom's home after the storm damaged the power lines and home equipment this winter… They replaced Main Service Upgrade Overhead, and added a Sub-Panel Install/Replacement Outdoors… the team of Branden, Jimmy, Ian, and Tylor worked long hours during the storm for a few days to get us up and running again before the next storm arrived.”
Carrie
Storm-damage main service upgrade
09Frequently asked questions

7 questions. Real answers.

Pulled from what we actually hear on quotes and on-site. If yours isn't here, ask us — we'll answer in plain English.

Does my ADU need its own PG&E meter?
Not necessarily. A subpanel fed from the main house service is the simpler path when the existing service has capacity, and it keeps you on one PG&E account. A separate meter is a second service — own account, own application, own timeline — and it is the right answer when the existing service genuinely cannot carry both dwellings, or when separate tenant billing is a requirement for you. What we will not do is promise you one or the other before the load calculation and the building department have both had a look.
Will I need a panel upgrade for the ADU?
It depends on your existing service size and what the ADU is going to run. A 100A service carrying a full main house plus an all-electric ADU is the usual case where the answer is yes. Run the Panel Load Calculator for a first read, and when do I need 200A service covers the longer version of the decision.
Who pulls the permit — you or my general contractor?
We pull the electrical permit, and the cost is in our quote rather than a surprise add-on. On most ADU projects your general contractor holds the building permit and our electrical scope coordinates into it. If the address is in Santa Cruz, Capitola, Scotts Valley, or Watsonville it goes to that city's building department; everywhere else in the county it goes to the County. What to expect from permits and inspection walks through how it runs.
Can you do the electrical if someone else is building the ADU?
Yes, and that is the normal arrangement. We hold the C-10 and own the electrical scope while your general contractor holds the rest. For a heat pump we run the dedicated circuit and the disconnect and your HVAC contractor sets the equipment, because that is C-20 scope and outside our licence.
How early should I bring an electrician in?
At plan stage, before the drawings are final. The load calculation can change the ADU's appliance package or force a service upgrade, and both of those are far cheaper to discover on paper than after the slab is poured and the walls are up.
Does the ADU subpanel need its own ground rods?
If the ADU is a separate structure, it needs its own grounding electrode system and a disconnecting means at the building. An attached ADU or a JADU inside the existing footprint is a different situation and gets assessed on site — we will tell you which one you have at the inspection.
How long is the warranty?
20-year workmanship warranty on the electrical we install, and it transfers to the next owner along with the property — worth having in the file if the ADU is ever rented or sold. See warranty terms for what is covered.
10Even if Sunrise isn't the answer

Here’s the honest path — wherever it leads.

We'd rather you get the right outcome than the Sunrise outcome. Some of this points away from us on purpose.

Outside Santa Cruz County?

Look for a CSLB-licensed C-10 contractor near you and verify the licence at cslb.ca.gov. Ask for general liability and workers-comp proof, and ask specifically whether they have done ADU feeders and separately metered services before — it is a different coordination problem than a straight panel swap. The work should always include a permit and a building-department inspection.

Browse our field guides

Still at plan stage?

The electrical decisions that cost the most on an ADU get made before anything is built. Our panel and capacity guides cover the load question and the service question, free to read, no email wall.

Read the panel guides

Not sure the service can carry it?

A free on-site inspection gets you a real load calculation and a written report on what your existing service can and cannot take. You keep the report either way, whether or not you hire us.

Schedule a free inspection
12Service areas

We do this work everywhere in Santa Cruz County.

From Davenport to Pajaro Dunes, San Lorenzo Valley to Pleasure Point. Same crew, same warranty, same pricing.

13One more thing

Ready for a real number on your ADU electrical?

Free on-site inspection, a load calculation on your actual service, and a written quote. No pressure to book anything on the spot.