John R.
“Carlos and Aiden were prompt, polite, and an awesome duo. They knocked out a tough day replacing an ancient panel.”
Weatherhead, mast, and service-entrance conductors on the house side. PG&E owns the drop from the pole — we handle everything from the weatherhead down and coordinate their reconnect.
Overhead service has two owners, and the dividing line is the whole point of this page. PG&E owns the drop — the conductors running from their pole to your house. You own everything from where those conductors land: the point of attachment, the weatherhead, the mast, the service-entrance conductors down the wall, and the combination meter main they terminate in. When that house-side hardware fails, it is an electrician's job rather than a utility repair. PG&E will disconnect so we can work and reconnect when we are done, and that is the extent of their involvement.
What actually fails is predictable. Salt air on the coast eats galvanized mast and fittings from the outside in, and it does it faster than the rest of the house ages. Weatherheads crack and let water track down inside the conduit to the terminations below. Service-entrance conductor insulation goes brittle and splits after decades of sun. A mast that the drop has pulled sideways over the years leans, loosens at the roof flashing, and starts leaking. And in a winter storm, a limb comes down and bends a mast or tears a point of attachment out of a wall. Any of these can get the service tagged as unsafe the next time PG&E is on site for something else.
One thing to be straight about. If your main panel is also being replaced, this is not a separate purchase. A main panel job in our area is a full electrical service rebuild — weatherhead, mast, service-entrance conductors, combination meter main, and grounding, quoted as one scope. There is no cheaper version where you buy just the service cable instead of the panel job. This page is for the other situation: the panel is sound and staying, and the overhead service entrance above it is what needs work. If it turns out both need attention, we will say so at the inspection and quote it as the one job it actually is. Details are on the 200A panel upgrade page.
Because the mast, the conductors, and the terminations all get sized to the service, replacing them is the natural moment to settle whether the service should be bigger. Doing the mast twice is the expensive path. Run the Panel Load Calculator for a first read on capacity, or let a tech settle it at the free inspection. Any time a service is opened up, the grounding electrode system gets checked too — see grounding and bonding for why every downstream circuit depends on it. Corroded masts on 1940s Westside houses with a side yard barely wider than a ladder are exactly the awkward, access-constrained work a lot of shops would rather skip, and it is what we are built for.
A tech looks at the mast, weatherhead, conductors, point of attachment, and the meter enclosure below, and checks whether the panel behind it is staying or going. You get a written report and a real quote either way, with no pressure to commit.
We pull the permit with the city or County building department and book the PG&E disconnect. The utility side sets this calendar, not us, so we give you the date as soon as we have it.
PG&E de-energizes before we start. The old mast and weatherhead come off, the new mast is set and braced, new service-entrance conductors are pulled and terminated, penetrations are flashed and sealed, and grounding is verified. The building-department inspection and the PG&E reconnect follow the work — the inspector and the utility set that timing, not us.
We walk the finished service with you, point out what changed and why, hand over the permit number and the inspection sign-off, and register the 20-year warranty.
Almost nothing about this job is priced off the length of cable. What moves the number is height and access — a single-story mast on an open side yard and a two-story mast reached over a hillside deck are not the same job — plus how much of the service is genuinely being renewed and what the coastal exposure calls for in hardware. The one decision worth making before you sign anything is amperage. The mast, the conductors, and the terminations are all sized to the service, so if a larger service is anywhere in your next few years, building it once at the larger size beats paying for the same access twice. Run the Panel Load Calculator for a first read, or settle it at the free inspection. And if the panel below is also at end of life, the honest answer is one full service rebuild rather than two separate visits.
“Carlos and Aiden were prompt, polite, and an awesome duo. They knocked out a tough day replacing an ancient panel.”
“Thank you to the Sunrise Electrical Contracting team for updating the new main electrical system on my mom's home after the storm damaged the power lines and home equipment this winter… They replaced Main Service Upgrade Overhead, and added a Sub-Panel Install/Replacement Outdoors… the team of Branden, Jimmy, Ian, and Tylor worked long hours during the storm for a few days to get us up and running again before the next storm arrived.”
“I can't begin to describe how much Branden and Sunrise helped us out of a pinch. We had a serious electrical issue in our panel, and his team were on it. Worked quickly with the city and with PG&E to address the issue, and came in thousands of dollars under competitors' quotes. Hands-down, the best electrical company in Santa Cruz County!”
Pulled from what we actually hear on quotes and on-site. If yours isn't here, ask us — we'll answer in plain English.
We'd rather you get the right outcome than the Sunrise outcome. Some of this points away from us on purpose.
Look for a CSLB-licensed C-10 contractor near you and verify the licence at cslb.ca.gov. Ask for general liability and workers-comp proof, and ask how they intend to handle the utility disconnect — service-entrance work that skips the permit and the reconnect coordination is a corner being cut. Ask for references from service-entrance work in the last year.
Browse our field guidesCorroded masts and cracked weatherheads are hard to judge from the ground, and the parts that fail first are the parts you cannot see. Our panel and service guides cover what to look for, free to read, no email wall.
Read the panel guidesIf another contractor has told you the mast has to go, a free on-site inspection gets you a written second read at no cost. You keep the report either way, and sometimes the answer is that it can wait.
Schedule a free inspectionFrom Davenport to Pajaro Dunes, San Lorenzo Valley to Pleasure Point. Same crew, same warranty, same pricing.
Free on-site inspection, a written quote, and a 20-year guarantee on the work. No pressure to book anything on the spot.