PSPS in Boulder Creek, Felton and Ben Lomond: what the shutoff record shows
PG&E reports every Public Safety Power Shutoff to the CPUC, circuit by circuit. We read every report since 2019 for the circuits serving the San Lorenzo Valley. Here is how often the power has been shut off, how long it stayed off, and what that means for planning backup power.
About this article
Quick answer — the 30-second version
- PG&E's own reports show PSPS shutoffs on the circuits serving Boulder Creek, Felton, Ben Lomond and Brookdale four times, all in October 2019 and October 2020, and not since.
- When it happened, the power stayed off from under a day to about four days. In October 2020, about 6,000 customers on six valley circuits were out, some for more than two days.
- On the CPUC's fire-threat map, the centres of Boulder Creek, Ben Lomond and Brookdale sit in Tier 3, extreme fire risk, so a shutoff is still possible. Outages from PG&E's fast-trip safety settings are a separate thing and are not PSPS.
- PG&E aims to warn 24 to 48 hours ahead, but says the first alert can come the same day. Plan backup power around a multi-day outage, not an overnight one.
The short answer
A Public Safety Power Shutoff is PG&E turning off power to specific areas to reduce the risk of its equipment starting a wildfire[1]. PG&E files a report with the CPUC after each one[11], and those reports list every circuit that was shut off and the communities it serves.
Across those reports, circuits that PG&E lists as serving Boulder Creek, Felton, Ben Lomond or Brookdale were shut off in four events: October 9 to 12, 2019; October 26 to November 1, 2019; October 14 to 17, 2020; and October 25 to 28, 2020[6][7][8][9]. Santa Cruz County customers were also shut off in two events in 2024, but on circuits PG&E lists as Los Gatos, Rob Roy and Stelling, not the valley circuits[10].
So the honest picture is this: shutoffs have reached the valley, they have lasted days, and they have not reached it since October 2020. The centres of Boulder Creek, Ben Lomond and Brookdale are still mapped as extreme fire risk, so planning for one remains reasonable. Below is the record, how the warnings work, and what it means for backup power.
What a PSPS is, and when PG&E calls one
The CPUC describes a PSPS as a measure of last resort, used when the utility reasonably believes there is an imminent and significant risk that strong winds may topple power lines or blow vegetation into them[1]. Its 2019 decision requires the utilities to deploy de-energization as a last resort and justify why it was used over other measures[2].
PG&E lists what it weighs: low humidity, forecast high winds, dry material on the ground, vegetation near power lines, Red Flag Warnings from the National Weather Service, and real-time ground observations[4]. In a January 2025 explanation it gave guide values of humidity below 30% and sustained winds above 19 miles per hour[5].
The record for the San Lorenzo Valley
- OCTOBER 9 TO 12, 2019. Circuits serving Ben Lomond, Felton, Brookdale and Boulder Creek were shut off on the night of October 9. They came back between the afternoon of October 10 and midday October 12[6].
- OCTOBER 26 TO NOVEMBER 1, 2019. The same circuits went off on the evening of October 26. The last of them, on the Big Basin circuits serving Boulder Creek, came back on the evening of October 30, about four days later[7].
- OCTOBER 14 TO 17, 2020. Parts of the Big Basin and Camp Evers circuits serving Boulder Creek and Felton were shut off for less than a day, on the night of October 14 into October 15[8].
- OCTOBER 25 TO 28, 2020. Six circuits serving Boulder Creek, Ben Lomond, Brookdale and Felton, about 6,000 customers between them, were shut off on the night of October 25. Restoration ran from the evening of October 26 to the morning of October 28, with more customers on circuits shared with Scotts Valley and Los Gatos[9].
That last event is the useful one for planning. The CPUC's intent is that utilities restore service within 24 hours after a shutoff event ends[3], a clock that starts at the weather all-clear, not when the power went off. In October 2020, PG&E reported the Ben Lomond and Big Basin circuits among those it could not restore within 24 hours of the all-clear, giving the reason as lack of resources and inability to use a helicopter because of the weather[9]. Before power comes back, PG&E patrols the lines and repairs or clears what it finds[7], and in bad weather on steep, wooded circuits that takes time.
For comparison, in PG&E's November 2024 shutoff, 99% of customers were restored within 24 hours of the weather all-clear, with an average restoration time of 10.9 hours[20]. That was a different area and a different year. The valley's own record runs from under a day to about four.
Where the valley sits on the fire map
The CPUC's fire-threat map marks Tier 2 areas as elevated risk and Tier 3 as extreme risk[12]. On the CPUC's Tier 2 and 3 map layer, the centres of Boulder Creek, Ben Lomond and Brookdale fall in Tier 3. Felton's town centre falls outside the Tier 2 and 3 areas, with Tier 3 at sampled points on the surrounding hillsides[13]. Classification varies by location. PG&E's reports list the Felton circuits as partly Tier 3, partly Tier 2 and partly outside[6].
Santa Cruz County's 2019 de-energization response plan put about 57% of the county in Tier 3 and about 23% in Tier 2[14]. To check your own address, the CPUC's map viewer has a search bar[12].
Fast-trip outages are not PSPS
If your power drops suddenly on a dry, windy day with no warning, it may not be a PSPS at all. PG&E's Enhanced Powerline Safety Settings detect hazards on the power line and shut off power quickly to prevent an ignition, and PG&E uses them only in areas with high wildfire risk[15]. PG&E says outages from those settings are not Public Safety Power Shutoffs: a PSPS is planned, and these are not[15]. Where the cause is hard to find, PG&E says restoring power can take longer[15].
For backup planning, that means a planned shutoff is not the only outage to plan for. An unplanned trip arrives with no warning at all.
How the warnings work
The CPUC's guidelines set a minimum notification timeline, whenever possible: 24 to 48 hours ahead for affected customers, and 1 to 4 hours ahead where possible, with further notices when the shutoff starts and when power is coming back[2]. PG&E says that in some cases it may not send the first alert until the same day your power is shut off[4].
- ACCOUNT HOLDERS are enrolled in PSPS alerts automatically[4].
- ADDRESS ALERTS let you get alerts for any address that matters to you, such as a parent's house or a rental, without being the account holder[4].
- MEDICAL BASELINE customers get additional alerts, which PG&E says may include multiple texts, phone calls or a door-bell ring[16].
- COMMUNITY RESOURCE CENTERS open during a shutoff, with a place to charge devices and get updates[19]. In October 2020 PG&E ran them at St. Michael's Church in Boulder Creek and at Highlands County Park in Ben Lomond[8].
PG&E programs, as of October 2026
- GENERATOR AND BATTERY REBATE. Open to customers with an active PG&E account who are in Tier 2 or 3, a High Fire Risk Area, or on a fast-trip circuit. It covers portable generators that are on PG&E's qualified product list and CARB compliant, and portable batteries between 290 Wh and 1 kWh, so home battery systems are outside it. Applications are due within 12 months of purchase or by December 31, 2026, whichever is sooner[17].
- BACKUP POWER TRANSFER METER. A meter that helps you connect a backup power source during an outage. Eligibility includes the same areas, a single residential home, 200-amp or smaller service and a PG&E SmartMeter. PG&E says the program is fully subscribed for 2026, and to check back in January 2027[18].
Programs like these open, fill and close from year to year. Check PG&E's pages for the current status before you plan around one.
Planning backup power around the record
The valley's shutoffs ran from under a day to about four days[6][7][8][9]. That is the planning case: a system that only covers an evening is a bridge, not an answer. How long your backup lasts, and what it can run, is the decision.
The choice between a standby generator, a battery and solar, or both is laid out in Generator or battery for a mountain home?, including the well pump, which on many mountain properties is the load that sizes the whole system. Two rules hold whichever you choose. Never run a generator indoors or in a garage, even with the door open[22], or where its exhaust can get in through a window, door or vent. And never connect one to the house through an outlet[22]: a generator connects through a properly installed transfer switch or other approved equipment.
Boulder Creek, Felton, Ben Lomond and Brookdale are unincorporated, so the County of Santa Cruz is the permit authority for backup power work there[21]. We confirm what your installation needs, pull the permits and coordinate the inspection.
Before the next red-flag season
- Check your address on the CPUC fire map, and sign up for PG&E address alerts for any property you are responsible for
- If anyone in the home depends on powered medical equipment, look at PG&E's Medical Baseline program
- Write down what has to keep running for three or four days: water, refrigeration, medical equipment, heat, communications
- If you own a portable generator, plan how it will connect safely before the day you need it
Two ways to check. Both take a minute.
Check what applies to your home. Any one of these is reason to plan backup power properly rather than improvise.
Every quote is free. The range depends too much on your home to fake it.
We don't publish figures for this. Backup power ranges from a transfer switch for a portable generator to a standby generator or a battery system, and the cost depends on what you need running and for how long. We quote it in writing after a free look.
Financing · GoGreen Home
What it costs
What moves the number
What has to keep running, and for how many days · Whether a well pump is on the list · Generator, battery with solar, or both · Panel and transfer-switch work the design needs · Fuel, siting and the length of the runsPlan for days, not hours.
Check your address on the CPUC fire map and sign up for PG&E address alerts. Then list what must keep running for three or four days, because that is how long the valley's longest shutoffs have lasted. That list, and whether you are on a well, decides between a generator, a battery with solar, or both. Whatever you choose, connect it through a transfer switch or approved equipment, never through an outlet.
Here’s the honest path — wherever it leads.
We'd rather you get the right outcome than the Sunrise outcome. Some of this points away from us on purpose.
Get a backup plan sized to your loads
A free inspection looks at your panel, your service and what you need running, and you get a written quote for the option that fits.
Schedule a free inspectionGenerator or battery?
The equipment side of the decision, including the well pump and the two rules that keep generator owners safe.
Read the comparisonOutside Santa Cruz County?
Look up your address on the CPUC fire map and your PG&E alerts the same way. For the install, look for a CSLB-licensed C-10 contractor and verify the licence at cslb.ca.gov.
12 questions. Real answers.
The questions readers actually ask about this specific problem, answered in full.
How often has PSPS hit Boulder Creek and Felton?
How long did the power stay off?
Why did it take so long to get power back?
Is my address in a high fire-threat area?
How much warning will I get?
How do I get alerts for my parents' house or a rental?
My power went out with no warning on a windy day. Was that a PSPS?
What if someone in my home relies on medical equipment?
Does PG&E help pay for backup power?
Can I plug my generator into the house?
Generator or battery for a PSPS?
Do I need a permit for backup power?
Sources
- [1]Source 1: CPUC: Public Safety Power Shutoffs (PSPS), Definition of PSPS; a measure of last resort when there is an imminent and significant risk.CPUC: Public Safety Power Shutoffs (PSPS) — Definition of PSPS; a measure of last resort when there is an imminent and significant risk.accessed 2026-10-14
- [2]Source 2: CPUC Decision 19-05-042, De-Energization (PSPS) Phase 1 Guidelines (May 30, 2019), Last resort, p. 73; Appendix A minimum notification timeline 'whenever possible', p. 144.CPUC Decision 19-05-042, De-Energization (PSPS) Phase 1 Guidelines (May 30, 2019) — Last resort, p. 73; Appendix A minimum notification timeline 'whenever possible', p. 144.accessed 2026-10-14
- [3]Source 3: CPUC Decision 20-05-051, De-Energization Phase 2 Guidelines (May 28, 2020), Intent that service is restored within 24 hours after a de-energization event ends, p. 48.CPUC Decision 20-05-051, De-Energization Phase 2 Guidelines (May 28, 2020) — Intent that service is restored within 24 hours after a de-energization event ends, p. 48.accessed 2026-10-14
- [4]Source 4: PG&E: Public Safety Power Shutoffs, Factors PG&E weighs; first alert may come the same day; account holders need not sign up; Address Alerts for any address.PG&E: Public Safety Power Shutoffs — Factors PG&E weighs; first alert may come the same day; account holders need not sign up; Address Alerts for any address.accessed 2026-10-14
- [5]Source 5: PG&E Currents: No Rain, Strong Winds Keep Kern County Customers in the PSPS Window (January 21, 2025), Humidity below 30%; sustained winds above 19 miles per hour.PG&E Currents: No Rain, Strong Winds Keep Kern County Customers in the PSPS Window (January 21, 2025) — Humidity below 30%; sustained winds above 19 miles per hour.accessed 2026-10-14
- [6]Source 6: PG&E PSPS post-event report to the CPUC, October 9-12, 2019 (second amendment), Circuit table: Ben Lomond 0401 and 1101, Big Basin 1101 and 1102, Big Trees 0402, Felton 0401, Camp Evers 2105, with key communities, HFTD tiers and off/restore times.PG&E PSPS post-event report to the CPUC, October 9-12, 2019 (second amendment) — Circuit table: Ben Lomond 0401 and 1101, Big Basin 1101 and 1102, Big Trees 0402, Felton 0401, Camp Evers 2105, with key communities, HFTD tiers and off/restore times.accessed 2026-10-14
- [7]Source 7: PG&E PSPS post-event report to the CPUC, October 26 - November 1, 2019 (second amendment), Bay Area / Santa Cruz Mountains period; valley circuits off October 26, Big Basin circuits restored October 30.PG&E PSPS post-event report to the CPUC, October 26 - November 1, 2019 (second amendment) — Bay Area / Santa Cruz Mountains period; valley circuits off October 26, Big Basin circuits restored October 30.accessed 2026-10-14
- [8]Source 8: PG&E PSPS post-event report to the CPUC, October 14-17, 2020, Sectionalized Big Basin 1101/1102 and Camp Evers 2105 shutoffs, October 14-15; Community Resource Centers in Boulder Creek and Ben Lomond.PG&E PSPS post-event report to the CPUC, October 14-17, 2020 — Sectionalized Big Basin 1101/1102 and Camp Evers 2105 shutoffs, October 14-15; Community Resource Centers in Boulder Creek and Ben Lomond.accessed 2026-10-14
- [9]Source 9: PG&E PSPS post-event report to the CPUC, October 25-28, 2020, Circuit table with customer counts (Ben Lomond 0401: 747; Ben Lomond 1101: 708; Big Basin 1101: 2,181; Big Basin 1102: 1,420; Big Trees 0402: 860; Felton 0401: 47); Table 9, circuits not restored within 24 hours.PG&E PSPS post-event report to the CPUC, October 25-28, 2020 — Circuit table with customer counts (Ben Lomond 0401: 747; Ben Lomond 1101: 708; Big Basin 1101: 2,181; Big Basin 1102: 1,420; Big Trees 0402: 860; Felton 0401: 47); Table 9, circuits not restored within 24 hours.accessed 2026-10-14
- [10]Source 10: PG&E 2024 PSPS post-season data report (workbook), Sheet 12.Counties: Santa Cruz, 179 customers (October 17-20, 2024) and 553 (November 5-8, 2024); sheet 10.Distribution: Los Gatos 1106/1107, Rob Roy 2104, Stelling 1110.PG&E 2024 PSPS post-season data report (workbook) — Sheet 12.Counties: Santa Cruz, 179 customers (October 17-20, 2024) and 553 (November 5-8, 2024); sheet 10.Distribution: Los Gatos 1106/1107, Rob Roy 2104, Stelling 1110.accessed 2026-10-14
- [11]Source 11: PG&E: PSPS event reports (wildfire alerts), PG&E files a report with the CPUC after each PSPS; index of post-event reports, including that there were no PSPS de-energizations in 2022.PG&E: PSPS event reports (wildfire alerts) — PG&E files a report with the CPUC after each PSPS; index of post-event reports, including that there were no PSPS de-energizations in 2022.accessed 2026-10-14
- [12]Source 12: CPUC: Fire-Threat Maps and Fire-Safety Rulemaking, Tier 2 (elevated) and Tier 3 (extreme) definitions; GIS viewer at ia.cpuc.ca.gov/firemap with an address search.CPUC: Fire-Threat Maps and Fire-Safety Rulemaking — Tier 2 (elevated) and Tier 3 (extreme) definitions; GIS viewer at ia.cpuc.ca.gov/firemap with an address search.accessed 2026-10-14
- [13]Source 13: CPUC High Fire Threat District (Tiers 2 and 3) map layer, The layer behind the CPUC's HFTD viewer. Queried 2026-10-14 at the centres of Boulder Creek, Ben Lomond and Brookdale (Tier 3) and Felton (outside; Tier 3 on surrounding points).CPUC High Fire Threat District (Tiers 2 and 3) map layer — The layer behind the CPUC's HFTD viewer. Queried 2026-10-14 at the centres of Boulder Creek, Ben Lomond and Brookdale (Tier 3) and Felton (outside; Tier 3 on surrounding points).accessed 2026-10-14
- [14]Source 14: County of Santa Cruz: Electrical System De-Energization Response Plan (September 2019), About 23% of the county in Tier 2 and 57% in Tier 3.County of Santa Cruz: Electrical System De-Energization Response Plan (September 2019) — About 23% of the county in Tier 2 and 57% in Tier 3.accessed 2026-10-14
- [15]Source 15: PG&E: Enhanced Powerline Safety Settings, Detect hazards and shut off power quickly; only in high wildfire-risk areas; not PSPS; restoration can take longer when the cause is hard to find.PG&E: Enhanced Powerline Safety Settings — Detect hazards and shut off power quickly; only in high wildfire-risk areas; not PSPS; restoration can take longer when the cause is hard to find.accessed 2026-10-14
- [16]Source 16: PG&E: Medical Baseline Program, Additional PSPS alerts, which may include multiple texts, phone calls or a door-bell ring.PG&E: Medical Baseline Program — Additional PSPS alerts, which may include multiple texts, phone calls or a door-bell ring.accessed 2026-10-14
- [17]Source 17: PG&E: Generator and Battery Rebate Program, Eligibility (Tier 2/3 HFTD, HFRA or EPSS circuit); qualified portable generators; portable batteries 290 Wh to 1 kWh; deadline December 31, 2026. Read 2026-10-14.PG&E: Generator and Battery Rebate Program — Eligibility (Tier 2/3 HFTD, HFRA or EPSS circuit); qualified portable generators; portable batteries 290 Wh to 1 kWh; deadline December 31, 2026. Read 2026-10-14.accessed 2026-10-14
- [18]Source 18: PG&E: Backup Power Transfer Meter Program, Helps connect a backup power source during an outage; 200 A or smaller service; fully subscribed for 2026. Read 2026-10-14.PG&E: Backup Power Transfer Meter Program — Helps connect a backup power source during an outage; 200 A or smaller service; fully subscribed for 2026. Read 2026-10-14.accessed 2026-10-14
- [19]Source 19: PG&E: Community Resource Centers, A safe place to access electricity, get updates and find resources during a PSPS.PG&E: Community Resource Centers — A safe place to access electricity, get updates and find resources during a PSPS.accessed 2026-10-14
- [20]Source 20: PG&E PSPS post-event report to the CPUC, November 5-8, 2024, 99% restored within 24 hours of the weather all-clear; average restoration 10.9 hours.PG&E PSPS post-event report to the CPUC, November 5-8, 2024 — 99% restored within 24 hours of the weather all-clear; average restoration 10.9 hours.accessed 2026-10-14
- [21]Source 21: County of Santa Cruz: Building Permits & Safety, The County's building permit service, for addresses outside the four incorporated cities; permit types include solar and battery, and generators.County of Santa Cruz: Building Permits & Safety — The County's building permit service, for addresses outside the four incorporated cities; permit types include solar and battery, and generators.accessed 2026-10-14
- [22]Source 22: U.S. Consumer Product Safety Commission: Portable Generators safety alert (5123, October 2021), NEVER use a generator inside homes, garages, crawlspaces, sheds, or similar areas, even when opening doors and windows; locate it far from doors, windows and vents; never backfeed through a wall outlet.U.S. Consumer Product Safety Commission: Portable Generators safety alert (5123, October 2021) — NEVER use a generator inside homes, garages, crawlspaces, sheds, or similar areas, even when opening doors and windows; locate it far from doors, windows and vents; never backfeed through a wall outlet.accessed 2026-10-14
Backup power sized for a San Lorenzo Valley outage.
A free inspection covers your panel, your loads and the well pump if you have one, with a written quote for a generator, a battery or both.