EV Charge Time Calculator

How long a charge takes on the charger you have — or the one you're considering — and what it costs on PG&E's EV rate.

Skip to the result

Estimate only. These are planning figures, not a quote, a firm price or an electrical design.

Assumptions used

Vehicle
Tesla Model 3 Long Range
Charger
Level 1 (12A, NEMA 5-15)
Charge now
20%
Charge to
80%
Miles driven per year
12,000 miles
Your vehicle
The charger
This charge
Your driving
Time to charge
34h 43m

This session

  • Power reaching the battery1.3 kW
  • Added to the battery45 kWh
  • Drawn from the grid50 kWh
  • Cost off-peak$11.28
  • Cost at peak$26.90
  • Saved by charging off-peak$15.63

Over a year

  • Charging per year3,333.3 kWh
  • Yearly cost off-peak$751.93
  • Yearly saving off-peak$1041.70

Off-peak and peak are PG&E Schedule EV2-A. Charging overnight is the whole reason the two numbers differ.

The link carries the figures you entered, usage included, and no name or address. They sit in the link itself, which your browser does not send to our servers.

What's in this number

Charge time is the energy the pack needs divided by the power actually reaching it — amps times 240 volts, times a 90% wall-to-battery factor chosen for this calculator; DOE’s published estimate implies about 84%, so actual charging losses may be higher. Cost uses PG&E Schedule EV2-A, which is why the off-peak and peak numbers differ so much: the gap between them is the reason to plug in overnight. Battery sizes and efficiencies are manufacturer figures for the trim named; pick Other / Custom and enter your own if your car isn't listed.

What's next?

About this estimate

Sunrise Electrical Contracting holds California CSLB licence #C10-1097237 (C-10, Electrical).

This is a planning number, not a substitute for a licensed electrician confirming the panel, the service and the utility feed in person.

We work in Santa Cruz County.

To confirm these figures for your home

Call Sunrise at (831) 786-5506 or visit sunriseelectricalcontracting.com